I had to ease back on the work over the winter as it was just too cold and I was struggling with tennis elbow which was pretty unpleasant.
However, spring has finally arrived and I'm back working on the workshop.
I've fitted insulation in the roof.
- insulation.jpg (383.76 KiB) Viewed 26011 times
I've fitted the chimney for the wood burning stove which will be needed next winter.
- chimney.jpg (541.78 KiB) Viewed 26011 times
And I'm now in the process of installing wooden cladding over the insulation.
- cladding1.jpg (360.09 KiB) Viewed 26011 times
I've still got a way to go, but hopefully I should be at least partially operational by the time summer arrives.
The best part is going to be when I start installing workbenches and equipment.
Watch this space.